Login to myNYISO

Sign Up Now!

Forgot Password?

Real-Time Load
19308 MW

07/20/2008 03:25:00 EDT

Manuals

The NYISO Manuals are a set of documents that specify and help explain the procedures and policies that will be used to operate the bulk power system of the New York Control Area and to conduct the New York Wholesale Electricity Market. The manuals have been categorized into four principal subject headings:

Planning
Document NameSort DescendingDateTypeSize
 Comprehensive Reliability Planning Process Manual
2007-12-07  pdf   697 kb 
 Day Ahead Demand Response Program Manual
 This manual descibes the Day Ahead Demand Response Program (DADRP). It provides an overview as well as detailed information on eligibiity, registration procedures, bidding instructions and examples.
2003-09-26  pdf   314 kb 
 Emergency Demand Response Program Manual
 The Emergency Demand Response Program (EDRP) provides a mechanism for load reduction during emergency conditions, more specifically defined in this document.
2004-04-05  pdf   629 kb 
 Load Forecasting
 The Load Forecasting manual describes the Load Serving Entity (LSE) load forecasting methodology requirements for installed capacity studies; LSE and Transmission Provider (TP) load data reporting requirements; and the NYISO load forecast process.
2006-08-10  pdf   134 kb 
 System Analysis Data
 This manual describes data (both confidential and non-confidential) required by the NYISO to perform technical analyses and support its misson of preserving the reliability of the New York State Bulk Power System. Data descriptions are broken down by Generator perfomance data, system network representation data, system protection data, and Real-Time representation data. It also identifies data users and defines how and when data is to be submitted to the NYISO.
1999-09-24  pdf   2221 kb 
 Transmission Congestion Contracts
 This manual contains the rules, procedures, and guidelines that will be followed by the NYISO and its Customers concerning the TCC Auctions administered by the NYISO as described in the NYISO Services Tariff. The intent of this Manual is to identify and explain rules, procedures, and guidelines regarding TCC Auctions.
2007-05-31  pdf   468 kb 
 Transmission Expansion Interconnection
 This manual explains the review process for proposed transmission system expansions; explains studies, requirements and priorities for interconnecting loads or generators to the tranmission system; describes transmission system reliability assessment studies; and describes transmission study criteria, methodologies and procedures.
1999-09-28  pdf   188 kb 
Displaying 1-7 of 7

Contact Us

  Technical Documents Coordinator
  Phone: 518-356-6226
  Email: manuals@nyiso.com

Search Documents

Search for documents in:

© 1999-2008 New York Independent System Operator. ALL RIGHTS RESERVED