Login to myNYISO

Sign Up Now!

Forgot Password?

Real-Time Load
23891 MW

08/07/2008 21:00:00 EDT

Resource Adequacy
Document NameDateTypeSize
 2007 Installed Reserve Margin Study Data Master Input File (MIF)
2007-01-19  crtext   366 kb 
 2007 Upstate-Downstate Study Report
2007-08-31  pdf   597 kb 
 Locational Installed Capacity Requirements Review - Covering the New York Control Area, for the 2007-2008 Capability Year
2007-02-21  pdf   50 kb 
 Locational Installed Capacity Requirements Study - Covering the New York Control Area, for the 2006-2007 Capability Year
2006-04-10  pdf   44 kb 
 Locational Installed Capacity Requirements Study - Covering the New York Control Area, for the 2008-2009 Capability Year
2008-03-14  pdf   25 kb 
 NYISO Notice to Market Participants re: 2006-2007 IRM and LCRs - 03/15/06
2006-03-16  pdf   59 kb 
 NYSRC Announcement re: 2006-2007 IRM - 03/15/05
2006-03-16  pdf   51 kb 
 Locational Installed Capacity Requirements Study - Covering the New York Control Area, for the 2005-2006 Capability Year
2006-02-14  pdf   46 kb 
 NYCA Installed Capacity Requirements for the period May 2006 through April 2006
2005-12-08  pdf   211 kb 
 2002 Hourly loads used for 2006 LCR and IRM studies
2006-02-16  pdf   402 kb 
Displaying 1-10 of 10

© 1999-2008 New York Independent System Operator. ALL RIGHTS RESERVED